1、

This paper is a review of Jiangsu Social Science Information Project for the Tenth Five-year Plan.

论文是关于江苏省社科“十五”规划情报学项目的述评.

互联网摘选

2、

The testing device of Computer Numerical Control System is a state project of eighth-five plan.

摘要:“数控系统测试装置”为国家八五课题.

网络文摘精选

3、

Without clear regulations, a plan has stalled for a $ 4 billion coal-to-liquid project in North Dakota.

在没有法规的情况下, 一项北达科他州的价值40亿美元的煤转液项目已经搁浅.

互联网摘选

4、

Describe briefly the objective work scope, conceptual plan and benefits of the proposed project.

请概述建议项目之目标、范围 、 概念方案及其所带来的效益.

网络文摘精选

5、

Maintain an effective cost containment reduction plan and support bidding project.

有效控制成本,支持投标项目.

网络文摘精选

6、

Actually, converse project represented a kind of very efficient products plan train of thought and means.

实际上, 逆向工程代表了一种非常高效的产品设计思路和方法.

网络文摘精选

7、

To audit project plan and arrange the priority of the projects.

编制项目设计、生产、调试计划,安排项目优先性.

网络文摘精选

8、

Gas utilization project in an orderly manner according to plan implementation.

瓦斯利用工程均按计划有序实施.

网络文摘精选

9、

The project has also been listed as the National and provincial Torch Plan Project.

此开发项目还被列为国家和省的火炬计划项目。

互联网摘选

11、

Further, mega construction project related information integration model and the information standardization are studied and a conceptual model for information integration is proposed. A preliminary execution plan is offered for the development and application of the management information platform of one mega construction project.

进而本文研究了超大型工程建设项目信息集成的相关模型和其信息标准化问题,给出了信息集成的概念模型,并针对某超大型工程建设项目管理信息平台的实际开发应用给出了初步实施方案。

互联网摘选

12、

And in the light of the actual situation of JG financial information projects, using Microsoft Project 2007 project management software to give the method of project management schedule plan and optimization, and puts forward some suggestions and prospect.

并针对JG公司的财务信息化项目实际情况,运用Microsoft project2007项目管理软件,给出了项目管理过程中进度计划与优化的方法,并提出建议与展望。

互联网摘选

13、

In project implementation process, the contractor team shall select action plan based on current situation, determine implementation plan of the project, input resource, required time period, completion criteria and trace relevant information.

承包商团队在项目实施过程中,对项目面临的形势选定行动方案,确定项目的实施方案、投入资源、需要的时间周期、完成的标准及对相关信息进行跟踪。

provided by jukuu

  • 今日热词
  • 热门搜索

简答网英语词典(dict.jiandongshicai.cn)为您提供在线翻译、英语词典、单词大全、英译汉、汉译英等英语服务!可按单词头尾、字数和词义分类查询。支持lj:关键词格式查询例句。

用户反馈
请选择反馈类型(可多选):
您的联系方式:(如需回复请填写联系方式)
反馈内容:
提交成功 小编会尽快处理
回到顶部
点击反馈